Preparing your site for FTTP install

Fibre installs fail on the day when small site details get missed. Fifteen minutes of prep saves weeks of rescheduled visits.

5 min readUpdated May 2026
Key points
  • Agree the fibre entry point and router location before the visit
  • Have landlord permission in writing for leased sites
  • Keep the old line live for 7–14 days after the new install
  • Migrate VoIP, VPN and PBX one at a time, not all at once

Confirm the entry point

Decide where the fibre will enter the building. Engineers need a clear external route to the wall and a tidy internal path to your router location.

Router location

Pick a spot with power, ventilation and Ethernet cable runs to your switch. Placing the router in a locked comms cupboard is fine as long as the engineer can reach it.

Access and permissions

For leased premises, get written landlord permission before the install date — engineers will not drill without it.

Failover and cutover

Keep the existing line active for 7–14 days after the new fibre goes in. Migrate services (VoIP, VPN, cloud PBX) one at a time to confirm stability.